“Samruk-Energy” JSC | Integrated annual report
Green energy

Brief information about the group of companies “Samruk-Energy” JSC

“Moynak HPP” JSC

(“Samruk-Energy” JSC – 100 %)


Moynak hydropower plant was commissioned in 2012. The complex of Moynak HPP facilities with regulated Bestubinsk reservoir is a waterworks facility with pressure intake system, located 150 km east of Almaty in the upper reaches of Charyn River. The main purpose of Moynak HPP is to use HPP as maneuverable power source to cover peak loads in South Kazakhstan region. The hydropower plant was built in Raimbek district of Almaty region. The installed capacity of Moynak plant is 300 MW, two 150 MW hydro turbines. Modern process equipment used at the plant ensures maximum automation and trouble-free power generation process. According to the project, hydro power plant may produce up to 1,027 million kilowatt hours of electricity per year. Water consumption for electricity generation is 870, 7 cubic meters of water. The total volume of the reservoir at flood control storage level (FCSL) is 240 million m3; the useful capacity is 200 million m3. 300 MW Moynak HPP is the fifth largest hydro power plant in Kazakhstan and the country’s first generating power facility.

  1. Main product: electricity
  2. Core business: production and sale of electricity
  3. Location: the Republic of Kazakhstan, 050008, Almaty region, Raimbek district, Zhylysay r/a, Moynak HPP
  4. Number of commercial consumers:
  • “AlmatyEnergoSbyt” LLP
  • “ZhetysuEnergoTrade” LLP
  1. Organization Supply Chain:

Electricity is supplied from power sources via 110 kV lines to consumers in volumes in accordance with concluded contracts.

  1. Operating results for 2016:
Indicator 2014 actual 2015 actual 2016 actual 2017 plan
Installed electric capacity, MW 300 300 300 300
Electricity generation, mln. kWh 577 903 1,166 906
  1. Headcount: 127 persons.
  2. Company website: www.moynak.kz
  3. The main significant events and achievements and performance results of the group of companies:

2016 ended with a positive financial result of 4,739,920 thousand tenge.

  1. Infrastructure development, modernization: Modernization of workers’ settlement of “Moynak HPP” JSC, arrangement of a sports facility (football ground, volleyball court).

“Shardarinsk HPP” JSC

(“Samruk-Energy” JSC – 100 %)


“Shardarinsk HPP” JSC is a large power producing organization in the South Kazakhstan region, the core business line of which is production of electricity and its sale. Shardarinsk hydropower plant located in the South Kazakhstan region is the last dam of the cascade of dams on the Syr Darya River, flowing into the Aral Sea. The purpose of establishing “Shardarinsk HPP” JSC is to strengthen the coordination of activities on the operation of water and energy complex of the Naryn-Syrdarya cascade, and optimization of energy supply in Southern Kazakhstan. At the hydroelectric power plant, the mechanical energy of the moving masses of water is converted into electrical energy with the help of hydraulic turbines and hydro generators placed together with numerous auxiliary equipments in the buildings of the HPP. Over the years of operation of Shardarinsk HPP, commissioned in 1967, the maximum amount of electricity produced in floods in 1969 was 648.1 million kW/h. This record figure was beaten in 2010: Shardarinsk HPP which still operates on old equipment, thanks to the smooth operation of the plant and professionalism of employees of Shardarinsk HPP, the plant produced a record volume of 670 million kWh of electricity by the end of 2010.

At present, “Shardarinsk HPP” JSC is upgrading and reconstructing the existing hydropower plant’s equipment using modern technologies, which will subsequently create exceptionally favorable conditions for further growth in the Company’s electricity production and profitability.

  1. Main product: electricity
  2. Location: Republic of Kazakhstan, South-Kazakhstan region, Shardara city, 13, Elmuratov street
  3. Number of commercial consumers:
  • “Energosnab XXI” LLP
  • “Ontustik-Zharyk” LLP
  • “Energopotok” LLP
  • “Ontustik Zharyk Transit” LLP
  • “Kazsbytgrupp” LLP
  • “Kommunalservis” SU
  • “Nauryz” SPK
  • “Yugenergoimpuls” LLP
  1. Core business: production and sale of electricity
  2. The organization’s supply chain.

Electricity is supplied from power sources via 110 kV lines to consumers in volumes in accordance with concluded contracts.

  1. Operating results for 2016:
Indicator 2014 actual 2015 actual 2016 actual 2017 plan
Installed electric capacity, MW 100 100 100 100
Electricity generation, mln. kWh 565 465 334 320
  1. Headcount: 158 persons
  2. Company website: http://www.sharges.kz

Main significant events and achievements and performance results of the group of companies:

2016 ended with a positive financial result of 1,375,900 thousand tenge.

  1. The main significant events and achievements and performance results of the group of companies: 2016 ended with a positive financial result 1,375,900 thous. tenge
  2. Infrastructure development, modernization: The project “Modernization of Shardarinsk HPP” is implemented.

“Bukhtarminsk HPP” JSC

(“Samruk-Energy” JSC – 90 %)


Bukhtarminsk HPP is located 15 km below the mouth of Bukhtarma river, 350 km from the source of Irtysh River from Zaysan lake. Backwater formed by Bukhtarminsk HPP dam closes natural levels of Zaysan lake by 5–6 meters, forming a reservoir with capacity of 49,6 bcm. and surface area – 5490 sq.km.

The establishment of Bukhtarminsk hydropower plant solves many issues of energy sector, transport and fisheries. The working conditions of water transport after the construction of the hydroelectric power plant have improved dramatically due to the formation of a deep sea track at a distance of 500 km and the passage of regulated flow through waterworks facility.

Bukhtarminsk HPP is a very cost-efficient hydropower plant both in terms of the specific volume of work and in terms of cost parameters of electricity production.

The so-called “hard concrete” was used for the first time in the USSR during the construction of hydraulic structures of Bukhtarminsk HPP, specially designed technology was used for laying of the concrete. In 2002, samples of concrete were taken from 60 different points and sent for analysis to two independent laboratories. The analysis results showed that the strength of concrete increased in comparison with the period of construction. Also in 2002 Bukhtarminsk dam was recognized as the best in the world, as the quality of concrete exceeds all expected parameters.

  1. Main product: electricity
  2. Location: the Republic of Kazakhstan, 070825, East-Kazakhstan region,   Zyrianovsky district, Serebryansk city, 5, Graftio street.
  3. Number of personal accounts of commercial consumers: no
  4. Core business: Lease of property (concession)
  5. Organization Supply Chain: no
  6. The main significant events and achievements and performance results of the group of companies:

2016 ended with a positive financial result: according to the results of 2016, the total profit of Bukhtarminsk HPP JSC amounted to KZT 2 975 136 thousand tenge, thus exceeding the planned figure by 5 %

  1. Headcount: 10 persons
  2. Company website: www.bges.kz.

“Shulbinsk HPP” JSC

(“Samruk-Energy” JSC – 92,14 %)


Shulbinsk HPP is located in the middle reaches of Irtysh River, 70 km upwards of Semey city. Construction of hydropower plant began in 1976, it launched the first hydraulic unit into operation on December 23, 1987, and the last of six hydraulic units was put into operation on December 19, 1994.

The capacity of hydropower plant’s facilities is designed to pass under normal headwater level of 240 m maximum flood with a probability of exceeding 1 % – 7,770 m3/s, with a maximum headwater level 243 m 0.01 % probability – 8,770 m3/s

  1. Main product: electricity
  2. Core business:
  • Organizational and management;
  • Commercial;
  • Other activities not prohibited by the Law of the Republic of Kazakhstan “On joint-stock companies”.
  1. Location: Semey c., Shulbinsk vill. (ShHPP). Location of the executive bodies (UKHPP, ShHPP) – Ust-Kamenogorsk, 27, Kazakhstan street.

“Ust-Kamenogorsk HPP” JSC

(“Samruk-Energy” JSC – 89,99 %)


More than 40 % of hydropower plants are concentrated in the east of the Republic of Kazakhstan on the Irtysh River. The first of Irtysh cascades is Ust-Kamenogorsk Hydropower Plant. Currently, the plant located in the northeast suburb of Ust-Kamenogorsk, has four turbines (82,8 MW) with installed capacity of 315 MW. At an average, the plant’s long-term output is 1 580 million kWh, and in the low water year – 1 200 million kWh. Ust-Kamenogorsk HPP fulfills all its investment obligations and systematically implements a long-term program for modernization and reconstruction of fixed assets. Implementation of investment programs of Ust-Kamenogorsk HPP is aimed at improving the reliability and safety of operation of the main and auxiliary equipment, complex of hydraulic structures, and also to increase the efficiency of managing the operating modes of hydraulic units with ensuring the optimal choice of operating parameters.

  1. Main product: electricity
  2. Core business: Organizational, managerial and commercial activities.
  3. Location: registered addresses: Ust-Kamenogorsk, Ablaketka village. Location of the executive bodies Ust-Kamenogorsk city, 27, Kazakhstan str.

“Energia Semirechia” LLP

(“Samruk-Energy” JSC – 51 %)


“Energia Semirechia” LLP is a joint venture, which was established to build wind power plants (WPP) with a capacity from 60 MW to 300 MW in Shelek corridor of Enbekshikazakh district of Almaty region. Current participants of “Energia Semirechia” LLP are: “Samruk-Energy” JSC – 51 %, ZENITH GLOBAL FZE – 49 %.

“Energia Semirechia” Limited Liability Partnership was established on November 2, 2009 and provides services on production and sale of electricity, design and construction of facilities using renewable sources of energy, design and construction of facilities.

Almaty region has the most unique sites for potential wind farm construction in the world. These are Jungar Gates and Shelek corridor being the world’s promising wind farm construction sites owing to their wind characteristics. Free sites on Jungar Gates allow WPP to develop a general capacity of more than 1,000 MW. State-of-the-art technologies of wind turbine production allows building wind farms at competitive prices compared with traditional sources whilst receiving high-quality product – electricity corresponding to parameters acceptable for regional and national grid operators. It is expected that construction of new generating facilities including small hydropower plants and wind power plants (WPP) of Almaty region will largely cover the existing power shortage in the region.

  1. Main product: electricity
  2. Core business: generation and sale of electricity using renewable energy sources
  3. Location: the Republic of Kazakhstan, 050060, Almaty c., 75v/7, Al-Farabi str.
  4. Headcount: 9 persons.
  5. Company website: www.Energy7.kz

“Samruk Green Energy” LLP

(“Samruk-Energy” JSC – 100 %)


“Samruk-Green Energy” Limited Liability Partnership was established on January 25, 2012. It provides services on production of electricity, engineering and construction of facilities using renewable energy sources. “Samruk-Green Energy” LLP comprises 2 MW solar power plants in Kapshagay c. The possibility of decentralized provision of electricity for remote areas.

  1. Main product: electricity.
  2. Core business: production and sale of electricity using renewable energy sources.
  3. Location: 050010, the Republic of Kazakhstan, Almaty, 181 “B”, Kunaev str. 7th floor, office No. 704.
  4. Number of commercial consumers: Electricity is purchased in full volume by “SFC” LLP.
  5. Total value of assets (thousand tenge): 1,169,560 thousand tenge
  6. Operating results for 2016:
                Indicator 2014 actual 2015 actual 2016 actual 2017plan
Installed capacity, MW 2 2 2 2
Electricity generation, kWh 0,4 3 3 3
  1. Headcount: 11 persons.
  2. Company website: www.samruk-green.kz
  3. Organization supply Chain:

Electricity is supplied from power sources via 10 kV lines to consumers in volumes in accordance with concluded contracts.

The main significant events and achievements and performance results of the group of companies:

On March 11, 2016, as part of implementation of the Strategic Partnership Agreement signed between “Samruk-Energy” JSC and the American company “Primus Power”. Later the first energy-storage system EnergyCell (G1) was launched at the 2MW Solar Power Plant in Kapshagay.

Memorandums of cooperation with technical universities of Almaty city (KBTU, AUPET, KazNU) were signed, within the framework of which the Partnership conducts paid internships and practice for students and graduate students.

November 23, 2016, a state act for a land of 500 hectares was received for the project “Construction of solar power plant 50 MW “Solar Park” in the area of ​​Kapshagay city.

  1. Infrastructure development, modernization:
    Increased installed capacity of existing solar power plant. Recovery and maintenance of solar power plants.

“First wind power plant” LLP

(“Samruk-Energy” JSC – 100 %)


To implement the project in the field of renewable energy sources, “First wind power plant” LLP was established on June 27, 2011 under the registration number 40481–1901-TOO. Limited Liability Partnership “FWPP” provides services in generation of electricity, design and construction of facilities using renewable energy sources, design and construction of facilities. It is a dynamically developing enterprise, created for construction of wind power plants. The working commission of 45 MW WPP signed the Act on August 14, 2015 in the framework of project “Construction of 45 MW wind power plant near Ereymentau city (Akmola region) including a potential expansion up to 300 MW”.

  1. Main product: electricity.
  2. Core business: production and sale of electricity using renewable energy sources.
  3. Location: the Republic of Kazakhstan, 010000, Astana, Esil district, 15a, Orynbor str., (As of 01.03.2017 – Astana, Esil District, Kerey Street, Zhanibek Khandar, No. 12A.)
  4. Number of commercial consumers:

Electricity is purchased in full volume by “SFC” LLP.

  1. Operating results for 2016:
                Indicator 2014 actual 2015 actual 2016 actual 2017 plan
Installed capacity, MW 45 45 45 45
Electricity generation, mln. kWh 79 152 172
  1. Headcount: 20 persons
  2. Company website: www.pves.kz

“Ereymentau Wind Power” LLP

(“Samruk-Energy” JSC – 100 %)


«Ereymentau Wind Power» LLP was established on November 24, 2011. The core business of «Ereymentau Wind Power» LLP is production of electricity using renewable energy sources. Currently, “EWP” LLP is implementing the project «Construction of 50 MW wind power plant in Ereymentau area including the possible increase in capacity up to
300 MW».

  1. Main product: electricity
  2. Core business: production and sale of electricity using renewable energy sources
  3. Location: (as of 01.03.2017) – the Republic of Kazakhstan, 010000, Astana city, Esil district, Kerey, Zhanibek khandar street No.12 “A”, 3rd floor.
  4. Headcount: 16 persons.
  5. Company website: www.ewp.kz

“Kazhydrotechenergo” LLP

(“Samruk-Energy” JSC – 100 %)


In the framework of direction “Social Responsibility” the environmental protection is a priority (implementation of “green economy” strategy), in this connection the acquisition of “Kazhydrotechenergo” LLP is one of “Samruk-Energy” JSC priorities. The Partnership’s activity includes engineering, building facilities using renewable energy sources, independent technical devices and related to them facilities for production of electricity and (or) heat using renewable energy sources (projects – construction of 7 small hydropower plants by Kazhydrotechenergo).

“Kazhydrotechenergo” LLP is a company engaged in development of seven small hydropower plants in southern Kazakhstan with total capacity of 108 MW.

  1. Main product: electricity
  2. Core business: production and sale of electricity using renewable energy sources
  3. Location: Almaty c., the Republic of Kazakhstan, 188, Dostyk street, “Kulan” BC, suite 904
  4. Headcount: 3 persons.
  5. Company website: www.kgte.kz

“Teploenergomash” LLP

(“Kazhydrotechenergo” LLP – 95 %)


“Teploenergomash” LLP plans to build two power plants on Big Almaty Channel with a total capacity of 12 MW.
It is also planned to create a 19–22 HPP cascade on Shelek river of Enbekshikazakh area with total capacity of 60,8 MW (Almaty region).

Participants of “Teploenergomash” LLP are – 95 % “Kazhydrotechenergo” LLP, 5 % – an individual.

  1. Main product: electricity
  2. Core business: generation and sale of electricity using renewable energy sources

The main events and achievements and performance results of the group of companies:

  1. Location:the RK, Almaty c.13, al-Farabi ave., BC “Nurly Tau”, k.1V, suite 504

 